Cameroon - The Dibamba Power Project
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connec
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Hydro, Geothermal, Seaport, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Cameroon - The Dibamba Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connect the plant to the Southern Interconnected Grid, which provides electricity to the most populated and industrialized areas of the country. Its implementation will contribute directly to the development of the electric power infrastructure of Cameroon. By constructing the 86 MW power plant, the Dibamba project will provide additional capacity to support industrial expansion and meet the increase in demand, which currently runs at 6% per annum and is expected to continue for the foreseeable future. In addition, the project provides peaking and reserve capacity, thereby addressing a critical shortage in Cameroon electricity system. |
Original sector | Energy |
Budget |
Location
Country | Cameroon |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Hydro, Geothermal, Seaport, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Cameroon
- Expansion project for production of Palm Oil and Fruit Jams
- PRODUCTION DE PRODUITS ALIMENTAIRES PANIFIABLES A BASE DE FARINES COMPOSES
- Production of organic cosmetics, spices and teas
- PROJET DE PRODUCTION DES PROVENDERIES, POULETS, PORCS POUR ABATTAGE.
- UNITE DE FACONNAGE DU LIVRE SCOLAIRE
- Projet d'extension d'une rizerie
- PRODUCTION DE CACAO BIOLOGIQUE ET TRANSFORMATION EN CHOCOLAT DE LUXE
- PROJET DE MISE EN PLACE D’UNE UNITE SEMI INDUSTRIELLE DE FABRICATION DE CONDITIONNEMENT ET DE DISTRIBUTION DE PRODUITS COSMETIQUES A BASE D’EXTRAITS NATURELS A YAOUNDE
