logo

Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)

Sector: Commercial • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The Phase 2 of the Yaounde Sanitation Project (PADY.2) is a continuation of Phase 1 financed by the Bank, which had helped to develop 20% of the main river canal (Mfoundi) and its four tributaries crossing the city of Yaounde. This operation is justified by the current situation of the drainage network in the city of Yaounde which is inadequate and operating poorly, causing frequent floods after h

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)” is an infrastructure initiative in the Commercial sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Phase 2 of the Yaounde Sanitation Project (PADY.2) is a continuation of Phase 1 financed by the Bank, which had helped to develop 20% of the main river canal (Mfoundi) and its four tributaries crossing the city of Yaounde. This operation is justified by the current situation of the drainage network in the city of Yaounde which is inadequate and operating poorly, causing frequent floods after heavy rainfall (about 2000 mm per year). PADY 2 will help to develop the remaining canal, thus strengthening the positive impacts of the first phase in terms of health and urban poverty reduction. Besides the construction of: (i) a 6-km long drainage canal along the Mfoundi river's main bed, with two towpaths and crossings in some places, (ii) four 8-km long drainage canals along the tributaries, and (iii) a pilot domestic waste sludge disposal and treatment plant, the project will finance landscaping around the main canal and contribute to enhancing the vector control capacity of health centres in the project area. It will be implemented over 48 months with a cost, estimated at UA 102 448 000.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data