Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
One of 1,622 projects Taiyo tracks in Cameroon.
Source: African Development Bank (AfDB)
The Phase 2 of the Yaounde Sanitation Project (PADY.2) is a continuation of Phase 1 financed by the Bank, which had helped to develop 20% of the main river canal (Mfoundi) and its four tributaries crossing the city of Yaounde. This operation is justified by the current situation of the drainage network in the city of Yaounde which is inadequate and operating poorly, causing frequent floods after h
- Sector
- Commercial, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Phase 2 of the Yaounde Sanitation Project (PADY.2) is a continuation of Phase 1 financed by the Bank, which had helped to develop 20% of the main river canal (Mfoundi) and its four tributaries crossing the city of Yaounde. This operation is justified by the current situation of the drainage network in the city of Yaounde which is inadequate and operating poorly, causing frequent floods after heavy rainfall (about 2000 mm per year). PADY 2 will help to develop the remaining canal, thus strengthening the positive impacts of the first phase in terms of health and urban poverty reduction. Besides the construction of: (i) a 6-km long drainage canal along the Mfoundi river's main bed, with two towpaths and crossings in some places, (ii) four 8-km long drainage canals along the tributaries, and (iii) a pilot domestic waste sludge disposal and treatment plant, the project will finance landscaping around the main canal and contribute to enhancing the vector control capacity of health centres in the project area. It will be implemented over 48 months with a cost, estimated at UA 102 448 000. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Cameroon |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Cameroon
- Projet d'expansion pour Earthing Improver
- Agrandissement et rénovation d'un projet hôtelier
- Dibamba Power Plant
- Cameroon - Support Project for Modernization of the Land Registration System and Business Climate (PAMOCCA)
- Projet coopératif de transformation durable du bois du Cameroun
- SUPPORTING VALUE CHAINS THROUGH INCLUSIVE POLICIES, INVESTMENT PROMOTION AND ALLIANCES (CASSAVA).
- Projet d'expansion pour les produits de cacao
- Mise en place d'un nouveau site de production d'unité de production de Jus de Fruits.
