CAMEROON WATER AFFERMAGE - OBA for Coverage Expansion
Closed · Cameroon
Source: World Bank Group
The objective of the Water Lease - Output-Based Aid (OBA) for Coverage Expansion Project is to expand access to urban water supply in Cameroon through a subsidized household connections program, to be implemented by the international private operator, Office National de l'Eau Potable (ONEP) of Morocco, competitively selected to run the national water utility under a 10-year lease contract in Augus
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CAMEROON WATER AFFERMAGE - OBA for Coverage Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Water Lease - Output-Based Aid (OBA) for Coverage Expansion Project is to expand access to urban water supply in Cameroon through a subsidized household connections program, to be implemented by the international private operator, Office National de l'Eau Potable (ONEP) of Morocco, competitively selected to run the national water utility under a 10-year lease contract in August 2007. The project shall allow for the installation of 55,000 household connections in urban areas countrywide over 4 years, equivalent to a 25 percent increase in the total number of water connections in the country. An estimated population of 330,000 people shall gain access to safe piped water. For a typical household connection, the connection cost amounts to US$ 198, plus US$ 53 as an initial guarantee deposit, giving a total of US$ 251 to be paid upfront by a new customer. This clearly is not affordable to most urban households, where average monthly income is US$ 31 for the first income quintile increasing to US$ 68 for the third quintile. As a consequence, the households currently connected to the piped water network mostly belong to the fourth and fifth income quintiles. This connection subsidy project will be implemented as part of an urban and water development support International Development Association (IDA) loan, whose component three includes an amount of US$ 33 million from IDA to support the implementation of the public-private partnership between Cam water and the international private operator. The proposed connection subsidy program was explicitly included and analyzed as part of component three of the IDA operation, as it is an integral part of the lease contract. Financial management, procurement and safeguards policies issues were analyzed during the IDA loan preparation, and mitigation measures carried out under the implementation of the Bank loan. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Cameroon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cameroon
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Cameroon - Lom-Pangar Hydroelectric Project
- Nachtigal hydropower plant
- Kribi Container Terminal
- Cameroon - Agricultural Value Chain Development Project
- CAMWATER
- Douala Container Terminal
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
