Camino Al Norte Pump Station Replacement
Sector: Waste Processing and Treatment • Location: North Las Vegas, Nevada, United States of America
Source: Dodge
Presently the Camino Pump Station has three pumps which provide water to pressure zone 2330. Currently two of the pumps are capable of pumping 3000 GPM and the other 250 GPM. When the pump station was built, it was anticipated that an additional 3000 GPM pump would be necessary to meet future demands. For this reason, a concrete pad, electrical cabinet, conduit and piping were included in the proj
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Power Generation (CCGT), Commercial, Cement, Government, Manufacturing (Industrial)
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Camino Al Norte Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Presently the Camino Pump Station has three pumps which provide water to pressure zone 2330. Currently two of the pumps are capable of pumping 3000 GPM and the other 250 GPM. When the pump station was built, it was anticipated that an additional 3000 GPM pump would be necessary to meet future demands. For this reason, a concrete pad, electrical cabinet, conduit and piping were included in the project. Due to equipment reaching the end of its lifecycle, it is recommended that all pumps, valves... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Power Generation (CCGT), Commercial, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
