logo

Camino Aventura Resurfacing

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Bubbling Wells Road to approximately 1,300 feet east of Bubbling Wells Road Length: Approximately 1,300 feet District: 4 Community: Desert Hot Springs

The County of Riverside Transportation Department is proposing to resurface approximately 1,300 feet of Camino Aventura from Bubbling Wells Road to approximately 1,300 feet east of Bubbling Wells Road. Camino Aventura is classified as a Loc

Project Information FAQ

Project Information

4 Q
The project “Camino Aventura Resurfacing” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Bubbling Wells Road to approximately 1,300 feet east of Bubbling Wells Road Length: Approximately 1,300 feet District: 4 Community: Desert Hot Springs The County of Riverside Transportation Department is proposing to resurface approximately 1,300 feet of Camino Aventura from Bubbling Wells Road to approximately 1,300 feet east of Bubbling Wells Road. Camino Aventura is classified as a Local Road in the County of Riverside’s General Plan. Camino Aventura is a two lane road and is 64’ wide with curb and gutter along both sides of the roadway. The proposed project will include removing the existing roadway followed by placing back with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of concrete cross gutter, spandrel, and curb/gutter Utility adjustments Remove and replace barricade Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way, permits to enter and construct (PEC), or temporary construction easements (TCE) will be required to construct the proposed improvements. The project improvements will be within the existing footprint of the roadway and will not raise the roadway profile.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data