Camino Pablo Underground Utility Improvements
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
In 2020, the City established the Camino Pablo Underground Utility District, using Utility Rule 20A provisions and Municipal Code Chapter 13.12 procedures. Aerial electric and communication wiring that is currently supported via timber poles would be converted to an underground system in the public right of way along the west side of Camino Pablo between Camino Sobrante to 500 north of the El Toyo
- Status
- Prospective
- Sector
- Forest Products and Packaging, Government, Road, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Orinda, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Camino Pablo Underground Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | In 2020, the City established the Camino Pablo Underground Utility District, using Utility Rule 20A provisions and Municipal Code Chapter 13.12 procedures. Aerial electric and communication wiring that is currently supported via timber poles would be converted to an underground system in the public right of way along the west side of Camino Pablo between Camino Sobrante to 500 north of the El Toyonal intersection. PG&E would act as the project lead and Rule 20A funds allocated to Orinda (but ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Orinda |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Government, Road, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
