Camp Hall Master Sewer Extension
Sector: Water Supply and Storage • Location: Summerville, South Carolina, United States of America
Source: Dodge
Based on the information provided, we understand that the majority of the sewer extension will be installed using open cut methods. Jack and bore installation methods will be used at roadway crossings, and horizontal directional drilling (HDD) is being considered to install the new sewer line through environmentally sensitive areas, wetlands, and existing creeks. We also understand that two pump s
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Commercial
- Location
- Summerville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Camp Hall Master Sewer Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Based on the information provided, we understand that the majority of the sewer extension will be installed using open cut methods. Jack and bore installation methods will be used at roadway crossings, and horizontal directional drilling (HDD) is being considered to install the new sewer line through environmentally sensitive areas, wetlands, and existing creeks. We also understand that two pump stations and wet wells will be installed as a part of this project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Summerville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
