Camp Nett Infrastructure Phase II
One of 10,000+ projects Taiyo tracks in Connecticut.
Source: Dodge
This project includes the construction of medium voltage, low voltage and telecommunications infrastructure to convert the existing overhead electrical and telecommunications infrastructure of the site from overhead to underground. 2. The scope includes new 22KV overhead lines to the site, new ductbanks, new medium voltage cable, new telecommunication ductbanks and all equipment, materials and acc
- Status
- Closed
- Sector
- Telecommunications, Road, Power Generation (CCGT), Power Transmission, Commercial
- Location
- Hartford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Camp Nett Infrastructure Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the construction of medium voltage, low voltage and telecommunications infrastructure to convert the existing overhead electrical and telecommunications infrastructure of the site from overhead to underground. 2. The scope includes new 22KV overhead lines to the site, new ductbanks, new medium voltage cable, new telecommunication ductbanks and all equipment, materials and accessories required for the complete conversion of the overhead utilities to underground. 3. Scope ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Hartford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Road, Power Generation (CCGT), Power Transmission, Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
