Campbell HS Cooler/Freezer Replacement
Sector: Warehouse • Location: Smyrna, Georgia, United States of America
Source: Dodge USA
This project consists of the replacement of the existing freezer & cooler units, condensing units, exterior ground mounted pads, and mechanical, electrical, controls, and security systems for the freezer & cooler. This includes slab and utility demolition, and other scope
- Status
- Prospective
- Sector
- Warehouse, Commercial, Power Transmission, Power Generation (CCGT), Education, Government
- Location
- Smyrna, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Campbell HS Cooler/Freezer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding, Pre-Qualification |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the replacement of the existing freezer & cooler units, condensing units, exterior ground mounted pads, and mechanical, electrical, controls, and security systems for the freezer & cooler. This includes slab and utility demolition, and other scope |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Smyrna |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Warehouse, Commercial, Power Transmission, Power Generation (CCGT), Education, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- Woodridge traffic
- CONSTRUCTION OF NEW 103,406 SQ FT SPECULATIVE WAREHOUSE - INCLUDES LOT MERGER AND DEMO OF ALL (E) STRUCTURES
- NEW 9,870 SQ FT BUILDING FOR WAREHOUSE. "F" OCCUPANCY, TYPE III-B CONSTRUCTION
- ZONING TEXT AMENDMENT TO ALLOW TRUCK TERMINAL IN IP DISTRICT WITH CUP; CUP FOR AMAZON LOGISTICS TRUCK TERMINAL
- SUBDIVISION OF AN (E) WAREHOUSE LEASED SPACE INTO INDIVIDUAL TENANT UNITS USING PRE-FABRICATED PARTITION SYSTEM, SEE TEXT
- CONSTRUCT A 7,844 SQ. FT. ADDITION TO AN EXISTING WAREHOUSE
- TI FOR NON-CONDITIONED SHELL BUILDING 93,515 SQ FT. (3224 OFFICE/90,291 WAREHOUSE)
- SPECULATIVE OFFICE TI BUILDOUT 2,529 SQ FT AND WAREHOUSE LIGHTING (REFER TO SHELL 202105270)
