Campbell HS Cooler/Freezer Replacement
Sector: Commercial • Location: Smyrna, Georgia, United States of America
Source: Dodge USA
This project consists of the replacement of the existing freezer & cooler units, condensing units, exterior ground mounted pads, and mechanical, electrical, controls, and security systems for the freezer & cooler. This includes slab and utility demolition, and other scope
- Status
- Closed
- Sector
- Commercial, Education, Warehouse, Power Generation (CCGT), Power Transmission, Government
- Location
- Smyrna, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Campbell HS Cooler/Freezer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the replacement of the existing freezer & cooler units, condensing units, exterior ground mounted pads, and mechanical, electrical, controls, and security systems for the freezer & cooler. This includes slab and utility demolition, and other scope |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Smyrna |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Warehouse, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
