logo
ProjectIn Implementation

Campo Palomas Wind Power Project

One of 2,477 projects Taiyo tracks in Uruguay.

Source: Inter-American Development Bank (IADB)

Nicefield is a special-purpose corporation established to develop a 70 MW wind farm called Campo Palomas under an operating lease agreement with state company Administración Nacional de Usinas y Transmisiones (UTE). The wind farm is located in the Department of Salto, about 540 km from Montevideo. It involves the installation of 35 Vestas 110 wind turbines of 2.0 MW each. An investment of US$173 m

Status
Under Construction
Sector
Road, Raw Materials, Biomass, Manufacturing (Industrial), Commercial, Wind, Power Generation (CCGT), Power Transmission
Location
Uruguay
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Campo Palomas Wind Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Campo Palomas Wind Power Project” is an infrastructure initiative in the Road sector, located in Uruguay. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Not available for this record.

Status

Original status

in implementation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Nicefield is a special-purpose corporation established to develop a 70 MW wind farm called Campo Palomas under an operating lease agreement with state company Administración Nacional de Usinas y Transmisiones (UTE). The wind farm is located in the Department of Salto, about 540 km from Montevideo. It involves the installation of 35 Vestas 110 wind turbines of 2.0 MW each. An investment of US$173 million is projected for purchasing and installing the wind turbines, building internal roads, and laying internal subterranean power lines, as well as constructing 6 km of 150-kV transmission lines connecting to the Salto Grande-Arapey substation (150 kV) and the wiring for the entire wind farm.Enertey is a Uruguayan company that leads the concessions market. It currently operates two wind farms of 50 MW each.Inabensa is a Spanish company that is a global leader in the design and manufacture of power plant systems and the construction of substations and transmission lines.Abengoa is a global engineering and technology company founded in 1941 in Seville, Spain. It is a global leader in the development of renewable energy, infrastructure, and waste recycling. It has been operating in Latin America since 1963 and has a presence in more than 80 countries.The proceeds from the IIC loan will be used for the installation, start-up, and operation of the aforementioned wind farm.

Original sector

Energy

Budget

Location

Country

Uruguay

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Road, Raw Materials, Biomass, Manufacturing (Industrial), Commercial, Wind, Power Generation (CCGT), Power Transmission

Article published date

2025-12-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project