Campo Wind - 252 MW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Campo Wind project includes up to 60- 4.2 MW wind turbines (586 ft tall) proposed for 2,200 acres of the Campo Reservation. 28 turbines located between Hwy 94 and Tierra Del Sol Road/Shockey Truck Trail, 32 turbines between 94 and I-8, and 16 turbines north of I-8. 60 of those 76 turbine sites would reportedly move forward to the Final EIS. A new high voltage line is proposed to cross Church Road,
- Status
- Failure
- Sector
- Wind, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Campo Wind - 252 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Campo Wind project includes up to 60- 4.2 MW wind turbines (586 ft tall) proposed for 2,200 acres of the Campo Reservation. 28 turbines located between Hwy 94 and Tierra Del Sol Road/Shockey Truck Trail, 32 turbines between 94 and I-8, and 16 turbines north of I-8. 60 of those 76 turbine sites would reportedly move forward to the Final EIS. A new high voltage line is proposed to cross Church Road, Old 80 and I-8 |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
