Campo Wind - 252 MW
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Campo Wind project includes up to 60- 4.2 MW wind turbines (586 ft tall) proposed for 2,200 acres of the Campo Reservation. 28 turbines located between Hwy 94 and Tierra Del Sol Road/Shockey Truck Trail, 32 turbines between 94 and I-8, and 16 turbines north of I-8. 60 of those 76 turbine sites would reportedly move forward to the Final EIS. A new high voltage line is proposed to cross Church Road,
- Status
- Failure
- Sector
- Power Transmission, Wind, Road, Power Generation (CCGT), Commercial
- Location
- Boulevard, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Campo Wind - 252 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Campo Wind project includes up to 60- 4.2 MW wind turbines (586 ft tall) proposed for 2,200 acres of the Campo Reservation. 28 turbines located between Hwy 94 and Tierra Del Sol Road/Shockey Truck Trail, 32 turbines between 94 and I-8, and 16 turbines north of I-8. 60 of those 76 turbine sites would reportedly move forward to the Final EIS. A new high voltage line is proposed to cross Church Road, Old 80 and I-8 |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Boulevard |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Wind, Road, Power Generation (CCGT), Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
