logo

Campo Wind Project with Boulder Brush Facilities

Sector: Steel • Location: California, United States of America (USA)

Source: San Diego County Water Authority

Project
Closed

The Campo Wind Project with Boulder Brush Facilities includes an overhead 230 kilovolt generation transmission line, a high voltage substation, a switchyard, in/out connection to the existing Sunrise Powerlink, and access roads on private land under the jurisdiction of the County of San Diego. The gen-tie line would carry wind generated energy from the proposed Campo Wind Facilities on the Campo B

Project Information FAQ

Project Information

4 Q
The project “Campo Wind Project with Boulder Brush Facilities” is an infrastructure initiative in the Steel sector, located in California, United States of America (USA). Taiyo aggregates data on it from San Diego County Water Authority.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Campo Wind Project with Boulder Brush Facilities includes an overhead 230 kilovolt generation transmission line, a high voltage substation, a switchyard, in/out connection to the existing Sunrise Powerlink, and access roads on private land under the jurisdiction of the County of San Diego. The gen-tie line would carry wind generated energy from the proposed Campo Wind Facilities on the Campo Band of Diegueño Mission Indians Reservation to the substation and switchyard on private land. The gen-tie line on private land would be approximately 3.5 miles in length and would include approximately 32 steel poles at a maximum height of 150 feet. The Project consists of the construction, operation, maintenance, and ultimately the decommissioning of a renewable wind energy generation project (252 megawatts).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data