logo
ProjectStart

Campus at Bayside - Phase 1

Start · California · Last reported Sep 2025

Source: Dodge

Building 1: a 101,600-square-foot asset (expandable to 104,600 square feet), including 6,000 square feet of speculative office space (expandable to 12,000 square feet), 178 auto parking stalls, 11 dock-high and two grade-level doors, a 125-foot truck court and 10 EV charging stations - Building 2: a 74,913-square-foot property with 5,020 square feet of office space, 119 auto parking stalls, eight

Status
Prospective
Sector
Warehouse, Electric Vehicles (EVs), Commercial, Automotive, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Residential, Cement
Location
Fremont, California, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Campus at Bayside - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Campus at Bayside - Phase 1” is an infrastructure initiative in the Warehouse sector, located in Fremont, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Building 1: a 101,600-square-foot asset (expandable to 104,600 square feet), including 6,000 square feet of speculative office space (expandable to 12,000 square feet), 178 auto parking stalls, 11 dock-high and two grade-level doors, a 125-foot truck court and 10 EV charging stations - Building 2: a 74,913-square-foot property with 5,020 square feet of office space, 119 auto parking stalls, eight dock-high doors and one grade-level door, a 125-foot truck court and 13 EV charging stations - Bu...

Budget

Location

Country

United States of America (USA)

State

California

City

Fremont

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Warehouse, Electric Vehicles (EVs), Commercial, Automotive, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Residential, Cement

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project