Campus Recreation Intramural Fields
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
General construction consists of all site work necessary to construct the synthetic turf field as shown on the contract documents. Work generally consists of erosion and sedimentation control, site demolition and clearing, bulk grading, installation of stormwater management facilities, fine grading, concrete curb and paving installation, synthetic turf field
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Commercial, Waste Processing and Treatment
- Location
- Slippery Rock, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Campus Recreation Intramural Fields
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General construction consists of all site work necessary to construct the synthetic turf field as shown on the contract documents. Work generally consists of erosion and sedimentation control, site demolition and clearing, bulk grading, installation of stormwater management facilities, fine grading, concrete curb and paving installation, synthetic turf field |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Slippery Rock |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
