Campus Steam Decommissioning Phase 2
Sector: Commercial • Location: Tuscaloosa, Alabama, United States of America
Source: Dodge USA
General contractors, Prime HVAC Contractors are required to prequalify for construction of the Campus Steam Decommissioning Phase 2 . At 5 campus buildings; remove existing steam heating systems, install replacement heating facilities, bring campus central thermal distribution to multipe buildings.
- Status
- Closed
- Sector
- Commercial, Geothermal, Fertilizers, Raw Materials
- Location
- Tuscaloosa, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Campus Steam Decommissioning Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General contractors, Prime HVAC Contractors are required to prequalify for construction of the Campus Steam Decommissioning Phase 2 . At 5 campus buildings; remove existing steam heating systems, install replacement heating facilities, bring campus central thermal distribution to multipe buildings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Tuscaloosa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Fertilizers, Raw Materials |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
