logo
ProjectClosed

Campus Steam Distribution Replace - Phase 2

One of 10,000+ projects Taiyo tracks in New York.

Source: Dodge

The work of this single bid project includes the complete abatement and demolition of all piping systems within the utility tunnel which extends for approximately 4,700 LF. A new medium pressure steam distribution system will be installed in the utility tunnels which include steam, condensate, and medium pressure return. The replacement of approximately 1,700 LF of direct-buried steam and condensa

Status
Closed
Sector
Manufacturing (Industrial), Tunnel, Fertilizers, Power Transmission, Raw Materials, Commercial, Power Generation (CCGT)
Location
Farmingdale, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Campus Steam Distribution Replace - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Campus Steam Distribution Replace - Phase 2” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Farmingdale, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work of this single bid project includes the complete abatement and demolition of all piping systems within the utility tunnel which extends for approximately 4,700 LF. A new medium pressure steam distribution system will be installed in the utility tunnels which include steam, condensate, and medium pressure return. The replacement of approximately 1,700 LF of direct-buried steam and condensate piping feeding 5 buildings. Installation of a temporary boiler at 8 different buildings to mai...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Farmingdale

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Tunnel, Fertilizers, Power Transmission, Raw Materials, Commercial, Power Generation (CCGT)

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project