logo

Campus UADE Main Building / Oficina Urbana | Converti + de Marco | Arquitectos

Sector: Road

Source: ArchDaily

Project
Closed

Text description provided by the architects.Generating the project of expansion and enhancement of the Urban Campus of the “Universidad Argentina de la Empresa” / UADE, in the central area of the City ofBuenos Aireson 9th of July Avenue, meant leading one of the most important events of the new urban habits, taking into account the great generational changes regarding educational formats, the new

Project Information FAQ

Project Information

3 Q
The project “Campus UADE Main Building / Oficina Urbana | Converti + de Marco | Arquitectos” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.Generating the project of expansion and enhancement of the Urban Campus of the “Universidad Argentina de la Empresa” / UADE, in the central area of the City ofBuenos Aireson 9th of July Avenue, meant leading one of the most important events of the new urban habits, taking into account the great generational changes regarding educational formats, the new spatial order derived from the different one on one behaviors and their impact on university practices and the modern technologies applied to teaching and, in particular, in this case, the permanent growth of UADE's student body and, together with this, the University's future strategic guidelines.On the eighth and ninth floors are located classrooms meeting terraces and cafeteria services. Finally, on the tenth floor, a proposal of innovative value for collaboration, production, and meetings between students, professors, and researchers defines a 1000 m2 floor called UADE Xperience, which gives a differential form to an activity of high academic impact on the highest level, a site that will also constitute a great view overlooking the vast skyline of the city of Buenos Aires.The challenge was met with the development of four basements and seven levels located between the two original buildings on Lima Street, integrated as a whole with a large-scale architectural and engineering piece of height, characterized by a length of eighty meters and three levels of height, thus achieving the objective of promoting an exceptional reference to the great dimension of on 9th of July Avenue.In functional terms, the structural scheme designed and built has allowed the location and integration from the second basement, with a direct and independent entrance from the street, of a cultural space for a performing arts auditorium and a visual arts gallery.Then, on the ground floor, a large double-height covered access with an open and landscaped courtyard at the back is organized towards the Lima Street front, defining differentiated side entrances. From the second to the seventh floor, an orderly system of classrooms with new vertical and horizontal circulations is associated and extended to the general circuit of movements and services of the university and modifies the order and design of the existing buildings. Subsequently, on the eighth floor, a retreat applied on the new high-rise front gives greater expression to the upper reticular structure applied to floors nine and ten.Therefore, and in the face of so many and varied conditioning factors, another aspect that was fundamental in the previous design task of the work: to constitute, due to the hierarchy of the Institution, an intervention conceived as a symbolic contribution to the city. All these circumstances were articulated with the need to complete a vacant space on the main front of the university and at the same time achieve a unique crowning on the upper level.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data