Canal Bank Stabilization
Sector: Water Supply and Storage • Location: West Palm Beach, Florida, United States of America
Source: Dodge USA
:The scope of work involves re-establishing and armoring the canal banks at one 1 canal crossing on Ponce de Leon Street; two 2 canal crossings on La Mancha Avenue; and, one 1 canal crossing on Madrid Street. Each location consists of one independent concrete road bridge.Site: Bridge Nos. 937355; 937356; 937358; & 937359The work involves earthwork to return the canal to the original design section
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | :The scope of work involves re-establishing and armoring the canal banks at one 1 canal crossing on Ponce de Leon Street; two 2 canal crossings on La Mancha Avenue; and, one 1 canal crossing on Madrid Street. Each location consists of one independent concrete road bridge.Site: Bridge Nos. 937355; 937356; 937358; & 937359The work involves earthwork to return the canal to the original design section and armoring of the canal banks with rubble rip-rap. The work includes: clearing and grubbing to... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
