Canal District Renewable Energy Project
Sector: Water Supply and Storage • Location: Sault Ste. Marie, Ontario, Canada
Source: Dodge USA
A proposed massive renewable energy project for Canal District that will be built on repurposed St. Mary's Paper lands, adjacent to the Francis H. Clergue Hydroelectric Generating Station. The project will have an expected storage capacity of 150 MW.
- Status
- Prospective
- Sector
- Water Supply and Storage, Forest Products and Packaging, Power Generation (CCGT), Commercial
- Location
- Sault Ste. Marie, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Canal District Renewable Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed massive renewable energy project for Canal District that will be built on repurposed St. Mary's Paper lands, adjacent to the Francis H. Clergue Hydroelectric Generating Station. The project will have an expected storage capacity of 150 MW. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Sault Ste. Marie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Power Generation (CCGT), Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
