logo

Canal Flats - Dike Upgrade Design and Construction

Sector: Power Generation (CCGT) • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The Canal Flats Dike Upgrade Design and Construction project includes upgrading the existing flood protection dike at the Village of Canal Flats to achieve the updated flood construction level with consideration to climate change. The current dike structure protects the community to approximately the 1-in-20 year flood level and the upgraded structure will provide protection to the 1-in-200 year f

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage, Commercial
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Canal Flats - Dike Upgrade Design and Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Canal Flats - Dike Upgrade Design and Construction” is an infrastructure initiative in the Power Generation (CCGT) sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Canal Flats Dike Upgrade Design and Construction project includes upgrading the existing flood protection dike at the Village of Canal Flats to achieve the updated flood construction level with consideration to climate change. The current dike structure protects the community to approximately the 1-in-20 year flood level and the upgraded structure will provide protection to the 1-in-200 year flood level with consideration to climate change. The total project area is 9,000 m2 with the majority of that area being the existing dike surface. The dike protects key infrastructure including the water system, sanitary collection system, power and telecommunications, administration building, school, and additional community infrastructure. An extreme flood event during the pandemic, or recovery from the pandemic, would further exacerbate economic recovery efforts. Key activities include: Site Investigations and Project Coordination Design Construction Preparation tender contract, specifications, and contract award, Construction of dike upgrades including contract administration, construction inspection, and environmental monitoring tasks. Post Construction -Preparation of record drawings, Project completion reporting

Original sector

Climate Resilience

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Commercial

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project