Canal Street Viaduct Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Rehabilitation of Canal Street Viaduct: Madison Street to Adams Street Viaduct Reconstruction Incl. 5,416 Ton Poly. Hot-mix Asph. Surf. Cse., Mix F, N80, Stone Matrix; 11,239 Sq. Ft. Rem. & Repl. Pcc S/W (5 600 Sq. Ft. Pcc Ada Ramp (5 6,141 Sq. Yd. Pav T. Rem.; 2,076 Cu. Yd Conc. Structures; 1 L.S. Furn. & Erect Str. Steel; 371,043 Lbs. Rebar (Epoxy Coated); 1 L.S. Trench Backfill; 3,100 Lb. Bit.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Canal Street Viaduct Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitation of Canal Street Viaduct: Madison Street to Adams Street Viaduct Reconstruction Incl. 5,416 Ton Poly. Hot-mix Asph. Surf. Cse., Mix F, N80, Stone Matrix; 11,239 Sq. Ft. Rem. & Repl. Pcc S/W (5 600 Sq. Ft. Pcc Ada Ramp (5 6,141 Sq. Yd. Pav T. Rem.; 2,076 Cu. Yd Conc. Structures; 1 L.S. Furn. & Erect Str. Steel; 371,043 Lbs. Rebar (Epoxy Coated); 1 L.S. Trench Backfill; 3,100 Lb. Bit. Mat L. (Tack Coat); 5,306 Ft. Conduit Attached To Struc., Pvc Galvanized Steel; 528 Ft. Rem. & Re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
