Cancelled Power Line Project
Sector: Power Generation (CCGT) • Location: Kenya
Source: The Eastleigh Voice
The project was intended to link Kenya with Uganda, Rwanda, Burundi, and the Democratic Republic of Congo, but was halted due to the wrongful termination of the contractor's contract in April 2016. Ketraco has been ordered to compensate the contractor after a lengthy legal battle.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- The Eastleigh Voice
ConstructChat
Ask ConstructChat about Cancelled Power Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project was intended to link Kenya with Uganda, Rwanda, Burundi, and the Democratic Republic of Congo, but was halted due to the wrongful termination of the contractor's contract in April 2016. Ketraco has been ordered to compensate the contractor after a lengthy legal battle. |
Original sector | Energy |
Budget |
Location
Country | Kenya |
Source
Source | The Eastleigh Voice |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Kenya
- Kenya Electricity Generating Company Olkaria II Expansion Nairobi
- Marble Value Chain
- CONSTRUCTION OF EPZA WAREHOUSES
- MANUFACTURE OF TEXTILES IN THE EXPORT PROCESSING ZONES.
- Aggreko Westen Kenya Temporary Power Station
- Thika Thermal Power Project
- Kwale Sugar plantation
- Aggreko Embakasi and Eldoret Power Stations
