logo
ProjectActive

Candela Equity

One of 10,000+ projects Taiyo tracks in Poland.

Source: International Finance Corporation (IFC)

Proposed IFC equity investment of up to €8m to acquire a minority stake in a new client, Candela (the “company”), an electric vessel manufacturer whose advanced hydrofoil technology reduces energy requirements by over 90% vs traditional boat structures, tackling the challenges in decarbonizing marine transport. The Company operates a factory and a sales office in Sweden and is opening its next fac

Status
Prospective
Sector
Water Supply and Storage, Warehouse, Energy Storage, Seaport, Manufacturing (Industrial), Commercial, Residential
Location
Poland
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Candela Equity

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Candela Equity” is an infrastructure initiative in the Water Supply and Storage sector, located in Poland. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed IFC equity investment of up to €8m to acquire a minority stake in a new client, Candela (the “company”), an electric vessel manufacturer whose advanced hydrofoil technology reduces energy requirements by over 90% vs traditional boat structures, tackling the challenges in decarbonizing marine transport. The Company operates a factory and a sales office in Sweden and is opening its next factory in Poland to serve emerging markets (EM) primarily in Asia. IFC to invest up to €8m in the company’s €20m equity round (in addition to €80-100m debt) at a c.€200m valuation, led by EQT Ventures. IFC investment will finance CAPEX for the new factory in Poland, helping move e-mobility value chains to the country, generate jobs as well as support the company’s expansion to service EM clients (the “project”). The facility in Sweden produces electric hydrofoiling commercial watercraft and consists of production halls, material storage, and administrative offices. The facility in Poland will mirror the Swedish factory but with larger capacity. The new factory will cover around 10,000 m2, retrofitting an existing and operational warehouse located near Gdansk, from which the company will lease a portion of the site to set up their production layout.

Original sector

M-CA - Ship Building and Repairing

Location

Country

Poland

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Warehouse, Energy Storage, Seaport, Manufacturing (Industrial), Commercial, Residential

Article published date

2026-03-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project