Candlestick Point Infrastructure Improvements
Sector: Car parking • Location: CA, United States of America (USA)
Source: Anvil Builders
The Candlestick Point Infrastructure Improvements project (CP-01) was the first phase for converting 700 undeveloped acres along San Francisco’s waterfront into a vibrant mixed-used community. Residential, retail and office space will be interspersed with areas designed for civic and community uses, as well as recreational open spaces. Anvil Builders was responsible for the complete infrastructure
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Candlestick Point Infrastructure Improvements project (CP-01) was the first phase for converting 700 undeveloped acres along San Francisco’s waterfront into a vibrant mixed-used community. Residential, retail and office space will be interspersed with areas designed for civic and community uses, as well as recreational open spaces. Anvil Builders was responsible for the complete infrastructure package of the new development, including 4000 ft of HDPE and RCP storm drain, 1600 ft of HDPE sanitary sewer, 6100 ft of low-pressure water lines, 2900 ft of recycled water lines, and 2500 ft of lighting conduit. Other appurtenances included cathodic protection for the waterlines, mass grading, landscaping and various street improvements. The Candlestick Park/Hunters Point development is one of the most anticipated and closely watched construction areas in the Bay area. This level of scrutiny, along with a fast-track schedule, made for a project with little room for error. And yet, Anvil not only turned over a successful project to the Owner, but did so on-time, while overcoming a number of challenges during the course of construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
