logo

Candlestick Point Infrastructure Improvements

Sector: Car parking • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

The Candlestick Point Infrastructure Improvements project (CP-01) was the first phase for converting 700 undeveloped acres along San Francisco’s waterfront into a vibrant mixed-used community. Residential, retail and office space will be interspersed with areas designed for civic and community uses, as well as recreational open spaces. Anvil Builders was responsible for the complete infrastructure

Project Information FAQ

Project Information

3 Q
The project “Candlestick Point Infrastructure Improvements” is an infrastructure initiative in the Car parking sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Candlestick Point Infrastructure Improvements project (CP-01) was the first phase for converting 700 undeveloped acres along San Francisco’s waterfront into a vibrant mixed-used community. Residential, retail and office space will be interspersed with areas designed for civic and community uses, as well as recreational open spaces. Anvil Builders was responsible for the complete infrastructure package of the new development, including 4000 ft of HDPE and RCP storm drain, 1600 ft of HDPE sanitary sewer, 6100 ft of low-pressure water lines, 2900 ft of recycled water lines, and 2500 ft of lighting conduit. Other appurtenances included cathodic protection for the waterlines, mass grading, landscaping and various street improvements. The Candlestick Park/Hunters Point development is one of the most anticipated and closely watched construction areas in the Bay area. This level of scrutiny, along with a fast-track schedule, made for a project with little room for error. And yet, Anvil not only turned over a successful project to the Owner, but did so on-time, while overcoming a number of challenges during the course of construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data