In May 2014, Consorcio Cantareira, a partnershiip of the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%), was awarded in a competitive bidding process the contract to build and operate the 328-km transmission line connecting Estreito to Fernao Dias, located at the states of Minas Gerais and Sao Paulo.

Only Consorcio Cantareira took part in the bidding process. The

Status
Prospective
Sector
Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cantareira Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cantareira Transmissora de Energia” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2014, Consorcio Cantareira, a partnershiip of the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%), was awarded in a competitive bidding process the contract to build and operate the 328-km transmission line connecting Estreito to Fernao Dias, located at the states of Minas Gerais and Sao Paulo. Only Consorcio Cantareira took part in the bidding process. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. The sponsors presented the lowest offer, a total value of US$ 22.3 million (BRL 76.9 million), the ceiling set by the regulatory agency. The contract was signed in September 2014, and the sponsors created the company Cantareira Transmissora de Energia to lead the project during the 30-year contract period. The sponsor committed to invest US$ 201.6 million (BRL 695 million) in the transmission line. In December 2016, Cantareira Transmissora de Energia was awarded a US$ 123.8 million (BRL 426.8 million loan from the state-owned bank BNDES. The remaining cost was equity financed. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project