In May 2014, Consorcio Cantareira, a partnershiip of the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%), was awarded in a competitive bidding process the contract to build and operate the 328-km transmission line connecting Estreito to Fernao Dias, located at the states of Minas Gerais and Sao Paulo.
Only Consorcio Cantareira took part in the bidding process. The
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cantareira Transmissora de Energia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In May 2014, Consorcio Cantareira, a partnershiip of the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%), was awarded in a competitive bidding process the contract to build and operate the 328-km transmission line connecting Estreito to Fernao Dias, located at the states of Minas Gerais and Sao Paulo. Only Consorcio Cantareira took part in the bidding process. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. The sponsors presented the lowest offer, a total value of US$ 22.3 million (BRL 76.9 million), the ceiling set by the regulatory agency. The contract was signed in September 2014, and the sponsors created the company Cantareira Transmissora de Energia to lead the project during the 30-year contract period. The sponsor committed to invest US$ 201.6 million (BRL 695 million) in the transmission line. In December 2016, Cantareira Transmissora de Energia was awarded a US$ 123.8 million (BRL 426.8 million loan from the state-owned bank BNDES. The remaining cost was equity financed. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project