Canyon Drive Water Main Replacement
Sector: Water Supply and Storage • Location: Portland, Oregon, United States of America
Source: Dodge USA
Install 950 linear feet of 8-inch ductile iron pipe and abandon the existing 8-inch cast iron water main installed in the late 1940s. All water services along SW Canyon Drive will be transferred to the new water main. The West Slope Water District may be seeking a consultant to prepare for a Sharon Lane Water Main Replacement Design.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Install 950 linear feet of 8-inch ductile iron pipe and abandon the existing 8-inch cast iron water main installed in the late 1940s. All water services along SW Canyon Drive will be transferred to the new water main. The West Slope Water District may be seeking a consultant to prepare for a Sharon Lane Water Main Replacement Design. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
