logo
ProjectStart

Canyon Dump Station Refurbishment

Start · Alberta · Last reported Oct 2020

Source: Dodge USA

Installation of 3,000 gallon trash tank before existing septic tank, and corresponding modifications to the existing gravity sewer. The new tank will require pavement removal in the dump station. Pavement replacement is not required, and the site should be restored to native conditions similar to the existing tank area following tank installation. Modifications of hydraulic flow and existing tanka

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Consumer Products, Car parking, Automotive, Raw Materials
Location
Cochrane, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Canyon Dump Station Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Canyon Dump Station Refurbishment” is an infrastructure initiative in the Commercial sector, located in Cochrane, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of 3,000 gallon trash tank before existing septic tank, and corresponding modifications to the existing gravity sewer. The new tank will require pavement removal in the dump station. Pavement replacement is not required, and the site should be restored to native conditions similar to the existing tank area following tank installation. Modifications of hydraulic flow and existing tankage as detailed in the design plans. Installation of new 5,600 igal settling/dosing tank after exi...

Procurement method

Location

Country

Canada

State

Alberta

City

Cochrane

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Consumer Products, Car parking, Automotive, Raw Materials

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project