Canyon Hydro Switch Replacement
Closed · Texas · Last reported Jul 2024
Source: Dodge USA
Replacement of the existing primary switch at the Canyon Hydro Substation. The existing switch is a 138kV, 600A, 550 BIL on the primary side of a currently de-energized transformer. The switch 1659 is intended to be replaced with one as close to the existing 1661 as indicated in the specifications with all accessories ready for mounting, connection, and immediate service. BUSS rework needed from s
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Canyon Lake, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Canyon Hydro Switch Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of the existing primary switch at the Canyon Hydro Substation. The existing switch is a 138kV, 600A, 550 BIL on the primary side of a currently de-energized transformer. The switch 1659 is intended to be replaced with one as close to the existing 1661 as indicated in the specifications with all accessories ready for mounting, connection, and immediate service. BUSS rework needed from switch 1659 to high side of transformer T1. Dispose of old switch offsite. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Canyon Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
