logo
ProjectActive

Cap des Biches

Active · Senegal

Source: International Finance Corporation (IFC)

The proposed project, to be developed by Contour Global Cap des Biches (the Company), involves the design, construction and operation of a 53 MW Heavy-Fuel Oil fired combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal. The project consists of three 16.5 MW combustion engines equipped with a 3.5 MW combined cycle / heat recovery system and a short transmission li

Status
Prospective
Sector
Oil and Gas, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Water Supply and Storage, Geothermal, Government
Location
Senegal
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Cap des Biches

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cap des Biches” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed project, to be developed by Contour Global Cap des Biches (the Company), involves the design, construction and operation of a 53 MW Heavy-Fuel Oil fired combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal. The project consists of three 16.5 MW combustion engines equipped with a 3.5 MW combined cycle / heat recovery system and a short transmission line of approximately 500 meters in length connecting the power plant to an existing adjacent substation. The proposed IFC investment is to provide a cross-currency swap of an LEQ of USD 9 million. The project site is adjacent to a defunct Senegalese power generation facility operated between 2000 – 2013 before being abandoned for commercial reasons, and is located in the Cap des Biches industrialized zone. The nearest inhabited zone, is located at around 400m to the east of the Project area. The project will use the fuel storage tanks installed for the defunct power plant on the adjacent site. The electricity will be sold independently for 20 years, within the framework of a power purchase agreement signed with SENELEC. The defunct plant (where the fuel storage tanks for the new project are located) is located on 2.5ha of land, edged to the west by the SENELEC substation. The new power plant will be built on a 3 ha plot to the east of the existing site. The affected land has been used for market gardening for several years.

Original sector

V-AC - Heavy Fuel Oil - Thermal Power Generation

Location

Country

Senegal

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Oil and Gas, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Water Supply and Storage, Geothermal, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project