Cap des Biches

Sector: Water Supply and Storage • Location: Senegal

Source: International Finance Corporation (IFC)

Project
Active

The proposed project, to be developed by Contour Global Cap des Biches (the Company), involves the design, construction and operation of a 53 MW Heavy-Fuel Oil fired combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal. The project consists of three 16.5 MW combustion engines equipped with a 3.5 MW combined cycle / heat recovery system and a short transmission li

Project Information FAQ

Project Information

4 Q
The project “Cap des Biches” is an infrastructure initiative in the Water Supply and Storage sector, located in Senegal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project, to be developed by Contour Global Cap des Biches (the Company), involves the design, construction and operation of a 53 MW Heavy-Fuel Oil fired combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal. The project consists of three 16.5 MW combustion engines equipped with a 3.5 MW combined cycle / heat recovery system and a short transmission line of approximately 500 meters in length connecting the power plant to an existing adjacent substation. The proposed IFC investment is to provide a cross-currency swap of an LEQ of USD 9 million. The project site is adjacent to a defunct Senegalese power generation facility operated between 2000 – 2013 before being abandoned for commercial reasons, and is located in the Cap des Biches industrialized zone. The nearest inhabited zone, is located at around 400m to the east of the Project area. The project will use the fuel storage tanks installed for the defunct power plant on the adjacent site. The electricity will be sold independently for 20 years, within the framework of a power purchase agreement signed with SENELEC. The defunct plant (where the fuel storage tanks for the new project are located) is located on 2.5ha of land, edged to the west by the SENELEC substation. The new power plant will be built on a 3 ha plot to the east of the existing site. The affected land has been used for market gardening for several years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data