logo
ProjectUnder Construction

Capacity 2, 3 and 4 Transmission and Distribution Upgrades

Under construction · Utah · Last reported Jan 2025

Source: Citizen Portal AI

A series of phased transmission and distribution upgrades (Capacity 2, 3 and 4) are ongoing to support growth and new development, with portions funded by developer contributions. A BRIC grant likely to be awarded will cover two-thirds of the cost for transmission upgrades on 600 North, including upgrades to a north-side transmission and a new south-side transmission to improve redundancy.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Hurricane, Utah, United States of America
Updated
22 Jul 2026
Source
Citizen Portal AI

ConstructChat

Ask ConstructChat about Capacity 2, 3 and 4 Transmission and Distribution Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Capacity 2, 3 and 4 Transmission and Distribution Upgrades” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Hurricane, Utah, United States. Taiyo aggregates data on it from Citizen Portal AI.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A series of phased transmission and distribution upgrades (Capacity 2, 3 and 4) are ongoing to support growth and new development, with portions funded by developer contributions. A BRIC grant likely to be awarded will cover two-thirds of the cost for transmission upgrades on 600 North, including upgrades to a north-side transmission and a new south-side transmission to improve redundancy.

Original sector

Energy

Location

Country

United States of America (USA)

State

Utah

City

Hurricane

Source

Source

Citizen Portal AI

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project