Capacity Development for Climate Mitigative Water Management Technology
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
The technical assistance (TA), which will be approved with the proposed Integrated Water Resources Management Project, will help the Ministry of Water Resources and Meteorology: (i) implement one of the activities of output 2 (para 6), (ii) inform rice farmers about and train them to implement innovative climate mitigative water management technology, and (iii) disseminate this innovative AWD tech
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Rail, Raw Materials, Fertilizers, Commercial, Consumer Products, Government, Natural Gas
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Capacity Development for Climate Mitigative Water Management Technology
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The technical assistance (TA), which will be approved with the proposed Integrated Water Resources Management Project, will help the Ministry of Water Resources and Meteorology: (i) implement one of the activities of output 2 (para 6), (ii) inform rice farmers about and train them to implement innovative climate mitigative water management technology, and (iii) disseminate this innovative AWD technology to the entire country. The TA project's demonstration activities are expected to reduce emissions by 11,750 tons of carbon dioxide equivalent. |
Original sector | Agriculture, natural resources and rural development |
Budget |
Location
Country | Cambodia |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Rail, Raw Materials, Fertilizers, Commercial, Consumer Products, Government, Natural Gas |
Article published date | 2024-11-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cambodia
- Koh Kong Bridge
- Stung Atay River Hydropower Station
- CAMBODIA IRRIGATED AGRICULTURE IMPROVEMENT
- BAKHENG WATER SUPPLY PROJECT
- Stung Tatay River Hydropower Dam, Koh Kong
- Lower Sesan 2 Hydropower Dam Construction
- Cambodia: Integrated Water Resources Management Project
- Integrated Urban Environmental Management in the Tonle Sap Basin Project
