Caparroso Wind Facility Repowering
Sector: Wind • Location: Caparroso, Navarra, Spain
Source: Energies Media
Grupo Enhol has selected Nordex to deliver turbines for the 34 MW repowering of the Caparroso wind facility in Spain. The project includes installation of wind towers, turbine blades, and other components manufactured in Spain, with hubs and drive train components produced in Germany. The project is financed through the Recovery and Resilience Facility of the European Union.
- Status
- Prospective
- Sector
- Wind, Rail, Power Generation (CCGT)
- Location
- Caparroso, Navarra, Spain
- Updated
- 22 Jul 2026
- Source
- Energies Media
ConstructChat
Ask ConstructChat about Caparroso Wind Facility Repowering
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Grupo Enhol has selected Nordex to deliver turbines for the 34 MW repowering of the Caparroso wind facility in Spain. The project includes installation of wind towers, turbine blades, and other components manufactured in Spain, with hubs and drive train components produced in Germany. The project is financed through the Recovery and Resilience Facility of the European Union. |
Original sector | Renewable Energy |
Location
Country | Spain |
State | Navarra |
City | Caparroso |
Source
Source | Energies Media |
URL |
More Details
Record type | Project |
Sector | Wind, Rail, Power Generation (CCGT) |
Article published date | 2025-12-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
