Cape Fox Road and Transmission Line Project
One of 10,000+ projects Taiyo tracks in Alaska.
Source: Senator Lisa Murkowski (.gov)
The project involves constructing a road and transmission line to connect the Mahoney Lake hydropower site to the Beaver Falls Power Grid. This is enabled by the conveyance of a 180-acre tract in the Tongass National Forest to Cape Fox Corporation, allowing consolidation of land ownership for the infrastructure development.
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Road
- Location
- Saxman, Alaska, United States of America
- Updated
- 19 Nov 2026
- Source
- Senator Lisa Murkowski (.gov)
ConstructChat
Ask ConstructChat about Cape Fox Road and Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves constructing a road and transmission line to connect the Mahoney Lake hydropower site to the Beaver Falls Power Grid. This is enabled by the conveyance of a 180-acre tract in the Tongass National Forest to Cape Fox Corporation, allowing consolidation of land ownership for the infrastructure development. |
Original sector | Energy and Transportation |
Location
Country | United States of America (USA) |
State | Alaska |
City | Saxman |
Source
Source | Senator Lisa Murkowski (.gov) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Road |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
