logo

Cape Verde - Cabeólica Wind Power Project Cost

Sector: Raw Materials • Location: Cape Verde

Source: African Development Bank (AfDB)

Project

The Cabeólica wind park project includes the construction, operation and decommissioning of four wind parks on the islands of Santiago, São Vicente, Sal and Boa Vista in the Republic of Cabo Verde. Wind parks will include 30 to 32 wind turbines of 850 kW providing a total capacity of about 28 MW (e.i. 20% to 25% of the current energy demand). The project also includes a request for a loan from AfD

Project Information FAQ

Project Information

4 Q
The project “Cape Verde - Cabeólica Wind Power Project Cost” is an infrastructure initiative in the Raw Materials sector, located in Cape Verde. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Cabeólica wind park project includes the construction, operation and decommissioning of four wind parks on the islands of Santiago, São Vicente, Sal and Boa Vista in the Republic of Cabo Verde. Wind parks will include 30 to 32 wind turbines of 850 kW providing a total capacity of about 28 MW (e.i. 20% to 25% of the current energy demand). The project also includes a request for a loan from AfDB for the installation of wind turbines in the purpose of producing 28 MW, as well as the set-up of transmission lines to provide energy to existing consumers. It will enable the country to diversify its energy grid which is currently dominated by the production of thermal energy diesel (97% of the total installed capacity). The diversification of the energy grid will ensure the stability of the network; this will result in a reduction of the frequency of outages of electricity in the country. The project will also result in the stabilization of energy tariffs due to the volatility of prices related to the importation of fossil fuels that currently represents a huge burden for the economy of the country.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data