logo
Project

Cape Verde - Electricity Transmission and Distribution Network Development Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Electricity Transmission and Distribution Network Development Project on Santo Antão, Sao Vicente, Sal, Maio, Santiago and Fogo Islands was designed after a feasibility study completed in September 2010 with financing from the Japan International Cooperation Agency (JICA). The project will help to upgrade power distribution networks to improve access to electricity and service efficiency and q

Sector
Commercial, Power Transmission, Power Generation (CCGT), Hotel, Government
Location
Cape Verde
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Cape Verde - Electricity Transmission and Distribution Network Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cape Verde - Electricity Transmission and Distribution Network Development Project” is an infrastructure initiative in the Commercial sector, located in Cape Verde. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Electricity Transmission and Distribution Network Development Project on Santo Antão, Sao Vicente, Sal, Maio, Santiago and Fogo Islands was designed after a feasibility study completed in September 2010 with financing from the Japan International Cooperation Agency (JICA). The project will help to upgrade power distribution networks to improve access to electricity and service efficiency and quality. The project will extend the MV/LV networks, strengthen and rehabilitate transmission lines and sub-stations, install the SCADA system comprising control, defect identification and management equipment (power cut and remote restoration) for distribution networks in three islands, and replacement of faulty meters. These activities will help to: (i) harmonize the voltage level at 20 kV for power distribution on all the islands covered by the project; (ii) reduce losses; (iii) increase the rate of access by the population to electricity services; (iv) reduce the duration of power outages caused by network defects; and (v) improve ELECTRA’s commercial performance. Its implementation will contribute to achieving the primary objective of the electricity sector development strategy, which seeks to raise power utility quality in Cape Verde.

Original sector

Energy

Budget

Location

Country

Cape Verde

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Power Generation (CCGT), Hotel, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project