Cape Verde - Project to mobilize surface water and strengthen the integrated water resources management framework (MES/RC-GIRE)
Sector: Raw Materials • Location: Cape Verde
Source: African Development Bank (AfDB)
The preparation of the Surface Water Mobilisation and Reinforcement of the Integrated Water Resources Management Framework Project (MES/RC-GIRE) mainly consists of the preparation of a maximum of five multi-purpose hydraulic development projects and the reinforcement of the framework for their sustainable viability. Specifically, this involves : 1) carrying out a detailed study aimed at developing
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The preparation of the Surface Water Mobilisation and Reinforcement of the Integrated Water Resources Management Framework Project (MES/RC-GIRE) mainly consists of the preparation of a maximum of five multi-purpose hydraulic development projects and the reinforcement of the framework for their sustainable viability. Specifically, this involves : 1) carrying out a detailed study aimed at developing surface waters with appropriate hydraulic schemes; 2) proposing development options for sites not selected for ODA studies; 3) strengthening national capacities in terms of monitoring water resources and managing and operating hydro-agricultural schemes; 4) strengthening the legal environment for Integrated Water Resources Management (IWRM) by reviewing the water law and drafting implementing regulations. This assistance was designed to improve living conditions for the population by mobilising surface water for domestic and agricultural use. The total duration of the project was 22 months and the estimated total cost was €1,559,000 excluding tax. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
