Capella Biomedical Research Laboratory, Cambridge Biomedical Campus
Sector: Cement • Location: United Kingdom
Source: Pharmaceutical Technology
In February 2016, the construction of a laboratory building known as Project Capella began at the Cambridge Biomedical Campus in Cambridge, UK. Biomedical research laboratory Cambridge Biomedical Campus February 2016 £79m ($112.48m) Spring 2018 Fairhurst Design Group (FDG) Kier Construction, Arup, Arcadis, Alcrete Building Systems In February 2016, the construction of a laboratory building known a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In February 2016, the construction of a laboratory building known as Project Capella began at the Cambridge Biomedical Campus in Cambridge, UK. Biomedical research laboratory Cambridge Biomedical Campus February 2016 £79m ($112.48m) Spring 2018 Fairhurst Design Group (FDG) Kier Construction, Arup, Arcadis, Alcrete Building Systems In February 2016, the construction of a laboratory building known as Project Capella began at the Cambridge Biomedical Campus in Cambridge, UK. Located next to the Cancer Research UK building near Addenbrooke’s Hospital, the facility will allow collaborations between scientists and clinicians to further advance the application of stem cell discoveries into the patient setting. The University of Cambridge was granted planning permission for the Capella building in February 2016. The project is expected to be completed with an estimated investment of £79m ($112.48m) by the second quarter of 2018. The Capella research facility will be a six-story building with 18,000m² of total floor space. The exterior will feature a two-storey glazed box with gold metal detail and a double-height entrance foyer. The building’s spine will be clad with flat-faced graphite panels. The building will include a green screen to enhance the public area surrounding the development. It will also feature a bespoke timber frame structure with a green roof, which will provide 324 cycle spaces on-site. The Capella facility will include sophisticated laboratory spaces, offices, cafés, seminar rooms, exhibition spaces and meeting suites to accommodate a range of biomedical research groups. It will also accommodate the Cambridge Institute for Immunotherapeutics and Infectious Disease, the Milner Therapeutics Institute and the Cambridge Stem Cell Institute. It aims to advance a centre of excellence and initiate a foundation for the development of new medical treatments. The facility will also include robotics suites for customised drug screening and gene editing, as well as bioinformatics support. Construction of the Capella biomedical laboratory began in February 2016. The facility is being built using building information modelling (BIM) techniques. More than 80% of the frame and façade was built off-site as precast modules consisting of precast columns, edge beams and precast floor slabs with structural toppings. A topping-out ceremony for the facility was held in April 2017. In January 2017, the installation of mechanical services inside the building began after six-metre prefabricated modules were installed on the ground floor and fan coil units installed from the ground floor to the third floor. The installation of all external cladding panels and gold box glazing was completed in March 2017. Designs for the Capella biomedical research laboratory were provided by UK-based architect Fairhursts Design Group (FDG). The building construction contract was awarded to Kier Construction, which is being assisted by a team of consultants, including Arup (consulting engineer), Arcadis (project manager) and Aecom (cost consultant). PCE was chosen as offsite superstructure construction partner, providing hybrid precast columns with a combination of precast concrete edge beams and structural steel delta beam spine beams. Alcrete Building Systems was appointed by PCE to provide design, manufacture, deliver and install more than 100 precast units. The building is being built with the aim of achieving an ‘excellent’ Building Research Establishment Environmental Assessment Method (BREEAM) rating. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |