Capilano Watershed Infrastructure Upgrades
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Dodge USA
The two projects currently being planned include a backup power system to ensure a reliable supply of drinking water in case of a power outage, as well as improvements to Metro Vancouver s watershed gatehouse area.
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- West Vancouver, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Capilano Watershed Infrastructure Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The two projects currently being planned include a backup power system to ensure a reliable supply of drinking water in case of a power outage, as well as improvements to Metro Vancouver s watershed gatehouse area. |
Budget |
Location
Country | Canada |
State | British Columbia |
City | West Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
