Capital Circle Southwest Road Widening Phase Two
Sector: Road • Location: Tallahassee, Florida, United States
Source: WTXL ABC 27 Tallahassee News
Phase Two of the Capital Circle Southwest project will widen 2.2 miles of the roadway to six lanes. The project was previously unfunded but is now beginning construction through the Moving Florida Forward Infrastructure Initiative, with anticipated completion in mid-2030.
- Status
- Under Construction
- Sector
- Road
- Location
- Tallahassee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- WTXL ABC 27 Tallahassee News
ConstructChat
Ask ConstructChat about Capital Circle Southwest Road Widening Phase Two
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase Two of the Capital Circle Southwest project will widen 2.2 miles of the roadway to six lanes. The project was previously unfunded but is now beginning construction through the Moving Florida Forward Infrastructure Initiative, with anticipated completion in mid-2030. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Florida |
City | Tallahassee |
Source
Source | WTXL ABC 27 Tallahassee News |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
