Capo Solar Power Project
Sector: Solar • Location: Mexico
Source: World Bank Group
In September 2011, the company Comercializadora Capo was awarded the license to build and operate a wind farm in Ojuelos de Jalisco, state of Jalisco. The first phase included the installation of 30 MW in solar panels; in the second phase, the capacity was set to increase to 100 MW. The electricity generated by the power plant was set to be directed to the national grid.
The sponsor committed
- Status
- Prospective
- Sector
- Solar, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Capo Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2011, the company Comercializadora Capo was awarded the license to build and operate a wind farm in Ojuelos de Jalisco, state of Jalisco. The first phase included the installation of 30 MW in solar panels; in the second phase, the capacity was set to increase to 100 MW. The electricity generated by the power plant was set to be directed to the national grid. The sponsor committed to invest a total of US$ 149 million in the construction of the power plant. The first phase involved a cost of US$ 82 million, 70% of which was financed with a loan from Nacional Financiera. The EPC contract was signed with the construction companies Morichal and Bajo Tierra. Operations were expected to commence in June 2014. As of September 2014, construction works were underway. |
Original sector | Energy |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
