Centrais Eolicas Assarua S.A., a subsidiary of the Brazilian company FIP Infraestrutura Energia Renovaveis (CER Energia), was granted authorizations to build a wind complex in the state of Bahia. The wind farm named Complexo Eolico Capoeiras e Assurua was set to be built in four phases.

The first phase included the construction of three power plants with total capacity of 68 MW. The following sp

Project Information FAQ

Project Information

5 Q
The project “Capoeiras and Assurua Wind Complex” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Centrais Eolicas Assarua S.A., a subsidiary of the Brazilian company FIP Infraestrutura Energia Renovaveis (CER Energia), was granted authorizations to build a wind complex in the state of Bahia. The wind farm named Complexo Eolico Capoeiras e Assurua was set to be built in four phases. The first phase included the construction of three power plants with total capacity of 68 MW. The following special purpose companies were created to manage each plant: * Pedra Branca S.A. - EOL Assurua II (30 MW) * Sao Pedro do Lago S.A. - EOL Assurua V (20 MW) * Sete Gameleiras S.A. - EOL Assurua VII (18 MW) The 35-year contracts were signed with the regulatory agency ANEEL starting in February 2014. In 2013, both power plants had been granted 20-year power purchase agreements with the several electricity distribution companies through public biddings. The sponsors offered an average tariff of US$ 43.6/MWh (BRL 102.78/MWh). The total investment in this first phase was estimated at US$ 81.7 million (BRL 272.6 million). Construction works commenced in November 2014 and were in advanced stages by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In June 2016, the state-owned bank BNDES approved a US$ 267.3 million (BRL 162.8 million) loan to the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data