logo

Caprivi Interconnector

Sector: Power Generation (CCGT) • Location: Namibia

Source: European Union Africa Infrastructure Trust Fund

Project
Close

The Caprivi project consisted of the construction of a 200 MW (designed to be upgradeable to 600 MW) High Voltage Direct Current transmission connection from Zambia to the Namibian electricity network, interconnecting the Northern and Western parts of the South African Power Pool (SAPP) network. This new line reinforces the electricity transmission interconnection between Zambia, Namibia and South

Project Information FAQ

Project Information

4 Q
The project “Caprivi Interconnector” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Namibia. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Caprivi project consisted of the construction of a 200 MW (designed to be upgradeable to 600 MW) High Voltage Direct Current transmission connection from Zambia to the Namibian electricity network, interconnecting the Northern and Western parts of the South African Power Pool (SAPP) network. This new line reinforces the electricity transmission interconnection between Zambia, Namibia and South Africa for provision of a reliable route for electricity exports and imports, support of a competitive regional power market and improved security of supply. The 970 km new transmission line starts at Katima Mulilo, in the north-eastern tip of Namibia, continuing along the Caprivi Strip, a narrow 400 km long section of Namibia on north-east of the country between Zambia and Botswana, and ends in Gerus, in central Namibia. The total Project Cost was 306m EUR and was funded by the promoter's own funds and a co-financing of the European Investment Bank (EIB), the Kreditanstalt für Wiederaufbau (KfW) and the Agence française de développement (AFD). Project implementation started in 2007. The line was commissioned in November 2010. The alternative to the Caprivi Interconnector would have been the purchase of coal generated energy from Zimbabwe, or to construct an own coal (base load) and/or gas (peaking) power plants which was environmentally unattractive and offered no potential upside from wheeling and energy trading in Namibia, nor power stabilisation or security of supply benefits to the region. The ITF Grant hence helped facilitating the investment into the economically and environmentally preferable option, with benefits beyond the Namibian borders. A summary of theProject Completion Reportwas issued in May 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data