logo

Carabobo Oil Project

Sector: Metal • Location: Thailand

Source: Hydrocarbon Technology

Project
Closed

Carabobo is a massive oil project being developed in Venezuela. The onshore oil field development comprises seven production blocks on the eastern part of the Orinoco Belt which is believed to contain approximately 513 billion barrels of heavy crude oil. Venezuela’s state-owned Petroleos De Venezuela (PDVSA) is developing the huge oil field under a three multibillion dollar development projects n

Project Information FAQ

Project Information

4 Q
The project “Carabobo Oil Project” is an infrastructure initiative in the Metal sector, located in Thailand. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Carabobo is a massive oil project being developed in Venezuela. The onshore oil field development comprises seven production blocks on the eastern part of the Orinoco Belt which is believed to contain approximately 513 billion barrels of heavy crude oil. Venezuela’s state-owned Petroleos De Venezuela (PDVSA) is developing the huge oil field under a three multibillion dollar development projects namely Carabobo-1, Carabobo-2 and Carabobo-3 by forming three separate joint ventures with foreign partners. Carabobo 1, the fourth biggest onshore oil field in the world, containing 31 billion barrels of recoverable oil reserve, started production by the end of 2012. Carabobo-2 and Carabobo-3 are yet to commence production. The Carabobo-1 project is owned and operated by Petrocarabobo, a joint venture formed between PDVSA (60%), Repsol (11%), Petronas (11%), ONGC Videsh (11%), Indian Oil Corporation (3.5%) and Oil India (3.5%) in May 2010. Petronas, however, announced its withdrawal from the project in September 2013. The Carabobo-2 project is owned and operated by Petrovictoria, a joint venture of PDVSA (60%) and Rosneft (40%), which was officially formed in May 2013. The Hamaca ‘heavy crude’ upgrade project is one of the four projects exploiting the Venezuelan extra-heavy crude oil and bitumen deposits situated in the Orinoco heavy-oil belt, in Central Venezuela. The Carabobo-3 project is owned and operated by Petroindependencia, a joint venture comprised of PDVSA (60%), Chevron Corporation (34%), Suelopetrol (1%) and Carabobo UK (JCU) – a joint venture between Mitsubishi, Japan Oil, Gas and Metal National Corporation (JOGMEC) and Inpex (5%). The joint venture was formed in May 2010. The Carabobo-1 project involves the development of two production blocks namely Carabobo-1 Norte and Carabobo-1 Centro. The Carabobo-2 project also comprises two blocks, namely Carabobo-2 North and Carabobo-4 West. The Carabobo-3 project consists of three blocks namely Carabobo-2 Sur, Carabobo-3 Norte and Carabobo-5. The combined recoverable oil reserves under the three projects are estimated to be more than 100 billion barrels. Carabobo-1 is the most advanced among the three projects. It produced its first oil from the well CGO-0005 in December 2012. Carabobo-1 was producing 30,000 barrels of crude oil per day towards the end of 2013. More than 40 additional development wells are planned to be drilled at the field using two drilling rigs. The oil field is expected to produce about 400,000 barrels of oil per day by 2018. Carabobo-2 was in very early stage of development as of the beginning of 2014. Conceptual engineering for the potential development of the Carabobo-3 oil field was underway by the end of 2013. The oil field is planned to have an early production level of 50,000 barrels per day, which is scheduled to peak at 400,000 barrels per day in 2020. Each of the three projects will have an upgrader facility capable of processing 200,000 barrels of heavy crude oil into lighter synthetic oil per day. The upgraders for Carabobo-1 and Carabobo-2 are expected to be built by 2017. The oil produced from the Carabobo project is planned to be transported by trucks until a trunk pipeline is constructed by PDVSA for carrying the Carabobo oil to the Port of Araya for export. Technip was awarded the contract for the front-end engineering design (FEED) and the first phase project management consultancy services for the Carabobo-1 upgrader project in April 2012. Technip is executing the contract from its operating centre in Rome in collaboration with PDVSA – Ingenieria y Construccion, a subsidiary of PDVSA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data