logo

Caracol Knits, S.A. de C.V.

Sector: Raw Materials • Location: Honduras

Source: Inter-American Development Bank (IADB)

Project
Repaid

CK is a company whose core activities are the manufacturing, processing, in-bond assembly, marketing, importing, and exporting of fabric, garments, and accessories. A full 81% of its manufacturing services are provided to Fruit of the Loom.The objective of this IIC operation is to provide CK with financing for the second phase of its project to design, supply, and build the industrial and agricult

Project Information FAQ

Project Information

5 Q
The project “Caracol Knits, S.A. de C.V.” is an infrastructure initiative in the Raw Materials sector, located in Honduras. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaid

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

CK is a company whose core activities are the manufacturing, processing, in-bond assembly, marketing, importing, and exporting of fabric, garments, and accessories. A full 81% of its manufacturing services are provided to Fruit of the Loom.The objective of this IIC operation is to provide CK with financing for the second phase of its project to design, supply, and build the industrial and agricultural components of a biomass (king grass and Bio-G) generation plant in Honduras with 20 megawatts of nominal capacity. Approximately 15 MW of the power generated will be used in the textile operations of the CK group of companies and the remainder sold to the Honduran National Electric Energy Company (ENEE).In the first phase, the company used its own resources to finance the installation of a saturated steam boiler capable of generating 35 tons of steam per hour and a backpressure turbine with 2 MW of installed capacity. The second phase consists of installing a boiler capable of generating 100 tons of steam per hour and a condensing turbine with 18 MW of nominal electric generating capacity. This phase also includes an investment in the agricultural components (planting of biomass crops) needed to fuel the boiler.The total cost of the project is US$65.2 million (US$22 million for the first phase and US$43.2 million for the second).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data