logo
ProjectClosed

CARAJAS IRON ORE

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

The project consists of the development of an iron ore (open pit) mining complex at Carajas with an initial capacity of 35 million tons per year (tpy), a deep-water port near the city of Sao Luis, in the Northeastern State of Maranhao, with a handling capacity of vessels of up to 280,000 dwt, and a single track 1.6 meter gauge railway line of approximately 890 km interconnecting the mine to the po

Status
Closed
Sector
Mass Transit, Water Supply and Storage, Rail, Steel, Metal, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CARAJAS IRON ORE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CARAJAS IRON ORE” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the development of an iron ore (open pit) mining complex at Carajas with an initial capacity of 35 million tons per year (tpy), a deep-water port near the city of Sao Luis, in the Northeastern State of Maranhao, with a handling capacity of vessels of up to 280,000 dwt, and a single track 1.6 meter gauge railway line of approximately 890 km interconnecting the mine to the port. The project also includes the development of a town-site at Carajas to accommodate an initial population of around 10,000, new housing and supporting facilities along the railway line, environmental and Amerindian protection components, and a staff training program.

Original sector

(Historic)Mining

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Water Supply and Storage, Rail, Steel, Metal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project