Caraquet - Landry Street Lagoon Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project consists of upgrading the Landry Street lagoon in Caraquet, New Brunswick. A comprehensive assessment of the existing lagoon determined that it has considerable leaks and is need of repair. The scope of the work includes reducing the size of the lagoon from 3.7 hectares to 2.0 hectares, but increasing the depth from 2 metres to 3 metres. Rehabilitation work will involve repairing the
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Road
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Caraquet - Landry Street Lagoon Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of upgrading the Landry Street lagoon in Caraquet, New Brunswick. A comprehensive assessment of the existing lagoon determined that it has considerable leaks and is need of repair. The scope of the work includes reducing the size of the lagoon from 3.7 hectares to 2.0 hectares, but increasing the depth from 2 metres to 3 metres. Rehabilitation work will involve repairing the dikes, adding synthetic membrane to seal the lagoon, and installing new control structures. In addition, a new building will be constructed to contain a two blower aeration system and a fine bubble diffuser air distribution system. This project aims to ensure the community of Caraquet has an increased capacity to treat and manage it’s wastewater in an environmentally sustainable manner. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
