Carbon Capture Pipeline Project
The owner, status and timeline of this project. A free account opens every field.
Source: DRG News
POET has partnered with Tallgrass to develop a carbon capture pipeline that will transport carbon dioxide from a bioprocessing facility in Fairmont, Nebraska, to permanent underground storage in Wyoming. The project aims to lower the carbon intensity of bioethanol production and is expected to begin commercial operations in 2025.
- Status
- Under Construction
- Sector
- Commercial
- Location
- Fairmont, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- DRG News
ConstructChat
Ask ConstructChat about Carbon Capture Pipeline Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | POET has partnered with Tallgrass to develop a carbon capture pipeline that will transport carbon dioxide from a bioprocessing facility in Fairmont, Nebraska, to permanent underground storage in Wyoming. The project aims to lower the carbon intensity of bioethanol production and is expected to begin commercial operations in 2025. |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Fairmont |
Source
Source | DRG News |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
